Products
Solutions
Resources
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information
When an Image file is attached, viewing functionality is limited to:
When attaching a PDF document, all functionalities exist, including:
| Description | |
|---|---|
| 1 | Save and Print |
| 2 | Facing 2-up and 4-up |
| 3 | Single page, Single Continuous and Pan |
| 4 | First / Last Page and Previous / Next Page |
| 5 | Select |
| 6 | Fit Page and Fit Width |
| 7 | Rotate Clockwise and Counter-Clockwise |
| 8 | Zoom In and Zoom Out |
When opening a Word or Excel document, a pop-up asks if you would like to launch the file in its default application. Click Yes to proceed.
Linking an attachment is useful when a desired attachment exists in one area, and also when tying it to another aspect of the project.
Click on an Attachments button, from Inspection History in our example.
With no current attachments tied to this inspection, click on File From Archive Library.
The File From Archive Library button directs you to the area where all attachments are housed in one area for all Checklist and Cx Item attachments.
Ensure the No Pending Updates button is greyed out at the bottom of the page, meaning all attachments will show in the Archive Library.
The Archive Library is used to store and distribute versioned project documents.
InEight Completions also automatically stores files and photos making them accessible within all Completions and Model applications.
The following actions in the Archive Library can be accessed:
|
Description |
|
|---|---|
| 1 | Search |
| 2 | Download All & Remove Local Activity |
| 3 | Stop Download |
| 4 | New Folder |
| 5 | Import Files |
| 6 | More Info |
| 7 | Label Filter |
1. Click on the Archive Library button.
2. Open any folder by clicking on the folder tile or the Carrot to the left of the file folder.
3. Click on the desired folder, being aware additional sub-folders may exist.
4. Click on the respective Download or View button.
Additional Information
9977 N 90th Street, Suite 250 Scottsdale, AZ 85258 | 1-800-637-7496
© 2024 InEight, Inc. All Rights Reserved | Privacy Statement | Terms of Service | Cookie Policy | Do not sell/share my information